The Grade 11 sectional elevation continues the Grade 10 build-up upward, and every layer is a real construction element with a purpose.

From the ground up: excavated trench → concrete strip foundation → substructure brickwork → DPC → surface bed on compacted fill → floor finish → superstructure brickwork → lintel over each opening → wall plate → ceiling.

Key elements:

  • A lintel spans an opening and carries the load of the brickwork above it. Without one, that load bears directly on the window or door frame.
  • The wall plate is a timber member bedded on top of the wall, distributing roof loads and giving the roof something to fix to.
  • Ceiling height is measured from finished floor level, commonly 2 400 mm in South African housing.

Hatching identifies materials. Brickwork, concrete, earth and timber each have their own conventional hatch, so a reader can tell what each layer is made of without a label on every one.

Core checkpoint: Every layer is there for a reason. If you cannot say what a layer does, you have drawn it from memory rather than understanding.

What is the name of the structural member that spans a door or window opening and carries the brickwork above it?

What happens in a real building if the lintel is omitted above a window?

What is the function of the wall plate?

Why does each material have its own conventional hatch on a sectional elevation?